By far the largest project in Geoscape history, the NHS channel is located in North Brampton in the Mount Pleasant area. With construction beginning with phase 1 in 2013, phase 3 was completed by 2015. Total planting was 10,000 trees and 30,000 shrubs. There are numerous natural habitat features that we installed, from amphibian pools to bush habitats. The trail system includes 3 metal fabricated bridges.